Restoration of Panaghia House, Babadag, Tulcea County

Text: Andrei Atanasiu

Built in 1837, the "Panaghia" House is located in the immediate vicinity of the Ali-Gazi Pasha's geam, the most important architectural monument of the town, the buildings being most probably linked during the period when the Muslim seminary was functioning at the Panaghia House. The name 'Panaghia' is Greek and means 'Holy Virgin Mary'.

From the first decade of the first century. It was a kindergarten until the post-war period. Since 1973 the building has housed a museum of oriental art. The museum offered the visitor pieces reflecting the traditional way of life of the Muslim population - whether from this region (such as some brass vessels or decorative fabrics) or from far away (oriental carpets, cashmere shawls, etc.). Some exhibits were specifically Muslim (the prayer rug, the ritual washing vessel), others belonged to different Dobrogene populations, even with Balkan circulation (household vessels, weapons, ornaments, decorative fabrics). In 2003, a sanitary unit and a storage area for the materials needed for the maintenance of the building were built in the courtyard of the Panaghia House, and the buildings were connected to the public water and electricity networks in the area. In 1999, the ground floor, which was in a pre-collapse state, was supported by metal columns embedded in concrete concrete sockets.

The works proposed for the consolidation, restoration and enhancement of the Panaghia House were as follows:

Title of the objective/ project: Promotion of cultural values through restoration and conservation of the museum point Casa Panaghia Babadag

LMI Code: Panaghia House TL-II-m-A-06001

Dating: înc. sec. XIX

Financier: Tulcea County Council through the Regional Operational Program 2014-2020/ 5/ 5.1

Beneficiary: I.C.E.M. Tulcea

General designer: S.C. ABRAL ART PRODUCT S.R.L.

Design collective:

Architecture - arh. A.I. Botez - complex project manager, arh. Andrei Atanasiu - project manager, arh. Marius Enache

Structure - Eng. Adrian Mircea Stănescu, eng. Daniel Purdea

Installations - eng. Bogdan Cristian Ionescu, eng. Florin Bălan, eng. Alexandru Botez, eng. Bogdan Vlădescu, eng. Rovana Preda

Site manager: S.C. TEHNOCONSULT PROIECT S.R.L. - eng. Marinela Vochița Mălai

Constructor: S.C. CORAL S.R.L. - Smaranda Bratu, eng. Cornel Georgescu, eng. Daniel Mocanu

Start/finalization date: 2019 / 2021