Graduation Projects - architects on the rise

Revitalization of Deva's green infrastructure through interventions on the axis Parc Cetate - Parc Bejan and modernization of the Bejan leisure area

Author: Bulc Alexandru Lucian

Supervisor: conf. dr. arh. Mirela Szitar-Sîrbu

Faculty: Politehnica University of Timișoara, Faculty of Architecture and Urbanism of Timișoara

Parameters: RH: Ground Floor / Sd: 902 m2 / POT: 15 / CUT: 0.15

1. The intervention solution proposes the development of a green area equipped with urban furniture, designed to serve both passers-by and residents in the area. The area has been conceived as a rest station for cyclists, strategically located at an optimal distance from the main axis of the cycle path, at the point where it branches off.

To meet the needs of relaxation and socializing, the project includes a variety of street furniture, seating areas and a shade. The latter, with a green roof, provides protection against rainfall and contributes to a pleasant microclimate. Surplus water from the roof, as well as rainwater from the sidewalk and

Coperta revistei

Read more in the magazine

Arhitectura 1-2/2026 (721-722)
Student Architects - 142+9 Graduation projects and projects